Prepco Flooring LLC is proud to announce our completion of the United States Navy Tacamo P-136 E-6B Maintenance Hangar Tinker AFB in Oklahoma City.

After a long and exhausting bidding process, Prepco Flooring was awarded the Polymer Flooring Contract for E-6B. Prepco Flooring was contracted through HGL Construction, a Prime Government Contractor based in Midwest City Oklahoma. Our approval process for the scope of work, prep methods, installation procedure and choice of materials had to go through an almost 2-year process being approved by NAVSEC. The P-136 is a 36,000 square foot maintenance hangar and is a single aircraft bay that maintains and supports the E-6B Boeing Mercury 707-320 – a massive aircraft which is 150 feet in length with a 148-foot wing span and is 342,000 pound in weight. Prepco Flooring’s Scope of Work and Installation procedure was to install a 100% Chemical Resistant Mortar Trowel Down System with a two High Performance Chemical Resistant Urethane Topcoats. The Polymer Flooring System had to be designed for weight distribution as well as full chemical resistance for Skydrol, Jet Fuel and FOD recovery. Crane Bay safety line striping and a precision aircraft towline stripe was included.

Prepco Flooring would like to thank our dedicated employees and supporting vendors for another project well done.